Oracle
 sql >> Teknologi Basis Data >  >> RDS >> Oracle

Bagaimana cara menghilangkan jam tidak bekerja di Oracle

Jika saya mengerti dengan benar, Anda ingin menghitung perbedaan antara tanggal mulai dan selesai tidak termasuk waktu sebelum jam 10 pagi dan setelah jam 7 malam.

Berikut contoh kueri dan sql fiddle.

SELECT start_time,
       finish_time,
       interval_time,
       EXTRACT (HOUR FROM interval_time), --extract the hours,mins and seconds from the interval
       EXTRACT (MINUTE FROM interval_time),
       EXTRACT (SECOND FROM interval_time)
  FROM (SELECT start_time,
               finish_time,
               NUMTODSINTERVAL (
                    CASE
                       WHEN finish_time - TRUNC (finish_time) > (19 / 24) --if finish time is after 7pm
                       THEN
                          TRUNC (finish_time) + (19 / 24)      --set it to 7pm
                       ELSE
                          finish_time      --else set it to actual finish time
                    END
                  - CASE
                       WHEN start_time - TRUNC (start_time) < (10 / 24) --if start time is before 10 am
                       THEN
                          TRUNC (start_time) + (10 / 24)    --set it to 10 am.
                       ELSE
                          start_time    --else set it to the actual start time
                    END,
                  'day') --subtract the both and convert the resulting day to interval
                  interval_time
          FROM timings);

Apa yang saya lakukan adalah,

  • Periksa apakah waktu mulai sebelum jam 10 pagi dan waktu selesai setelah jam 7 malam. Jika demikian, atur waktunya menjadi 10 pagi dan 7 malam.
  • Kemudian kurangi tanggal dan ubah hari yang dihasilkan menjadi Jenis Interval.
  • Kemudian ekstrak jam, menit, dan detik dari Interval.

Catatan: Kueri ini mengasumsikan bahwa kedua tanggal jatuh pada hari yang sama dan keduanya tidak sebelum jam 10 pagi atau setelah jam 7 malam.

PERBARUI: Untuk mengecualikan hari libur, kueri akan menjadi rumit. Saya menyarankan untuk menulis tiga fungsi dan menggunakan fungsi-fungsi ini dalam kueri.

Fungsi pertama:

FUNCTION modify_start_time (p_in_dte DATE) RETURN DATE
----------------------------------
IF p_in_dte - TRUNC (p_in_dte) < (10 / 24)
THEN
   RETURN TRUNC (p_in_dte) + (10 / 24);
ELSIF p_in_dte - TRUNC (p_in_dte) > (19 / 24)
THEN
   RETURN TRUNC (p_in_dte) + 1 + (10 / 24);
ELSE
   RETURN p_in_dte;
END IF;

Jika waktu mulai di luar jam kerja, ubah waktu mulai ke waktu mulai terdekat berikutnya.

Fungsi ke-2:

FUNCTION modify_finish_time (p_in_dte DATE) RETURN DATE
----------------------------------
IF p_in_dte - TRUNC (p_in_dte) > (19 / 24)
THEN
   RETURN TRUNC (p_in_dte) + (19 / 24);
ELSIF p_in_dte - TRUNC (p_in_dte) < (10 / 24)
THEN
   RETURN TRUNC (p_in_dte) - 1 + (19 / 24);
ELSE
   RETURN p_in_dte;
END IF;

Jika waktu selesai di luar jam kerja, ubah ke waktu selesai terdekat sebelumnya.

Fungsi ke-3:

FUNCTION get_days_to_exclude (p_in_start_date     DATE,
                              p_in_finish_date    DATE) RETURN NUMBER
--------------------------------------------------------
WITH cte --get all days between start and finish date
     AS (    SELECT p_in_start_date + LEVEL - 1 dte
               FROM DUAL
         CONNECT BY LEVEL <= p_in_finish_date + 1 - p_in_starT_date)
SELECT COUNT (1) * 9 / 24    --mutiply the days with work hours in a day
  INTO l_num_holidays
  FROM cte
 WHERE    TO_CHAR (dte, 'dy') = 'sun'    --find the count of sundays
       OR dte IN     --fins the count of holidays, assuming leaves are stored in separate table
             (SELECT leave_date  
                FROM leaves
               WHERE leave_date BETWEEN p_in_start_date
                                    AND p_in_finish_date);

l_num_holidays :=
   l_num_holidays + ( (p_in_finish_date - p_in_start_date) * (15 / 24)); --also, if the dates span more than a day find the non working hours.

RETURN l_num_holidays;

Fungsi ini menemukan jumlah hari yang akan dikecualikan saat menghitung durasi.

Jadi, kueri terakhir harus seperti ini,

SELECT start_time,
       finish_time,
       CASE
          WHEN work_duration < 0 THEN NUMTODSINTERVAL (0, 'day')
          ELSE NUMTODSINTERVAL (work_duration, 'day')
       END
  FROM (SELECT start_time, finish_time,
               --modify_start_time (start_time), modify_finish_time (finish_time),
                 modify_finish_time (finish_time)
               - modify_start_time (start_time)
               - get_days_to_exclude (
                    TRUNC (modify_start_time (start_time)),
                    TRUNC (modify_finish_time (finish_time)))
                  work_duration
          FROM timings);

Jika durasinya kurang dari 0, abaikan dengan menyetelnya ke 0.



  1. Database
  2.   
  3. Mysql
  4.   
  5. Oracle
  6.   
  7. Sqlserver
  8.   
  9. PostgreSQL
  10.   
  11. Access
  12.   
  13. SQLite
  14.   
  15. MariaDB
  1. Apa yang setara dengan SQL Server APPLY di Oracle?

  2. Cara lebih cepat untuk Menyisipkan, melalui skrip, di Oracle?

  3. Stempel Waktu Hibernasi dengan Zona Waktu

  4. Dukungan Bool Oracle SQL

  5. Apa Presisi dan Skala default untuk Angka di Oracle?